• Home
  • About
  • Archives
  • On the Net
Subscribe: Posts | Comments | E-mail
  • BJGAll things BJG.
  • CommunityBJG in the community.
  • FunWe have fun.
  • GreenWe heart green stuff.
  • On the BoardsOur latest projects here.
  • RevitBIMyness
  • SeminarsLearning.
  • TechnicalThe good stuff.

BJG

Posted on June 5, 2008 - by Pete

LEED meets BIM

Green Revit

Those of us who keep abreast of changes in the construction industry have been tracking two major trends over the last year or two. One has been the move of “Green Building” from the fringes of the industry into the mainstream. While not every project is going for US Green Building Council (USGBC) LEED (Leadership in Energy and Environmental Design) Certification, most of BJG’s clients are, at a minimum, talking about what it would take to get their project “Certified”. Once that conversation starts, the entire project team can, as a group, can make rational decisions as to whether the LEED Certification effort is economically or otherwise justifiable.

Conference room
The other major trend BJG | Architecture + Engineering has been tracking is the move toward Building Information Modeling (BIM). BJG has taken a very proactive approach to BIM. All of our projects are currently drawn in a three-dimensional information based modeling system (REVIT). This program differs from standard CAD systems in several significant ways. The primary difference is that models are not constructed by drawing lines. Instead, models are built by compiling objects with properties. For instance, every door has properties associated with it, such as a specific hardware group (door knob, lockset, hinges, closer, etc) and a swing direction. Other information that can be linked to an object includes material origin, delivery date, thermal performance, recycled content and price. In addition, the subcontractor responsible for installing the object can be identified, etc. In fact, there is virtually no end to the data that can be tracked within a BIM Model.

At BJG, we discovered that we can use BIM for our REVIT model, to help us determine appropriate strategies for achieving Green Design or LEED Certification. Through proper manipulation of the model, we can provide real time feedback on the cost and payback period of a variety of potential LEED Strategies including water use, insulation efficiency, glazing performance, etc.

Conference room lighting analysis using third party REVIT plugin

When we decided to put the effort into moving into the BIM world, we hoped to be able to provide better coordinated drawings; calculate material quantities and budget pricing; generate construction schedules; and provide real time visual analysis of changes to the design program. Once we started down this path however, it occurred to us that we could also calculate recycled material content, water use, storm water runoff and perform energy analysis. Once the right data is associated to the model, the model will tell us what the cost to increase roof insulation would be and what the energy savings from the change will be. We are really excited by this combination of what we thought were two separate initiatives into a coordinated effort to improve our design and the opportunity it has provided us.

Technorati Tags: BIM, construction, Green, innovation, innovative, LEED, Revit, USGBC

This entry was posted on Thursday, June 5th, 2008 at 8:42 am and is filed under Green, Revit. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

0 Comments

We'd love to hear yours!



Leave a Comment

Here's your chance to speak.

  1. Name (required)

    Mail (required)

    Website

    Message


Comments links could be nofollow free.
  • Categories

    • BJG
    • Community
    • Fun
    • Green
    • On the Boards
    • Revit
    • Seminars
    • Technical
  • Archives

    • September 2008
    • August 2008
    • July 2008
    • June 2008
    • May 2008
    • April 2008
    • March 2008
    • February 2008
    • January 2008
    • December 2007
    • September 2007
  • Blogroll

    • AEC News
    • ENR Blogs
    • Revit Blog
    • Revit Op Ed
  • Recent Posts

    • Cost vs. Value
    • Bad Poetry Day at BJG
    • 2008 SEAOC Convention
    • 2007 CBC Exit Distance with ESFR Sprinkler Systems
    • Reno Picnic 2008
  • Flickr Photos

  • BJG tweets

    • detailing concrete reinforcement. new code new details.
    • getting a 90% set out for a new client is gratifying
    • Going to dinner with the boss
    • @GreenSmith openoffice.org works. google docs or zoho.com work. none open docx files though.
    • Seaonc bbq at dolore park, sf
© 2008 BJG - Responsive By Design
The Papercut theme by WooThemes - Premium Wordpress Themes