• Home
  • About
  • Archives
  • On the Net
  • Subscribe
RSS: Posts
  • BJGAll things BJG.
  • CommunityBJG in the community.
  • FunWe have fun.
  • GreenWe heart green stuff.
  • On the BoardsOur latest projects here.
  • RevitBIMyness
  • SeminarsLearning.
  • TechnicalThe good stuff.

BJG

Posted on July 2, 2008 - by Boise

Logisticourt at Lincoln

On the Boards

BJG has begun the design of a three building industrial park called Logisticourt at Lincoln.  The owner of the park is DP Partners and we are pleased to be providing them with architectural, structural, and construction support services for this project.  The development will be located on the southwest corner of East Cheyenne Avenue and Lincoln Road in North Las Vegas, Nevada.

The project will include three buildings designed and constructed in one phase.  Building “A” will be a 75,000 square foot facility and will be “single loaded” having dock doors lining the south side of the building.  Building “B” will be a 210,000 square foot facility and will be “cross dock loaded” with dock doors lining two sides of the building on the north and south sides.  Building “C” will be a 123,750 square foot facility and “single loaded” on the north side.


Logisticenter at Lincoln Site Plan - Upload a Document to Scribd
Read this document on Scribd: Logisticenter at Lincoln Site Plan

Technorati Tags: dp partners, las vegas, On the Boards

You might also enjoy reading these...

  • Two BJG Designed Pump Stations Up and Running by Boise
  • Plaza 7 Retail Building in Tracy, CA by Teresa
  • Kaiser 7 Solar Project by John


This entry was posted on Wednesday, July 2nd, 2008 at 8:09 am and is filed under On the Boards. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

0 Comments

We'd love to hear yours!



Leave a Comment

Here's your chance to speak.

  1. Name (required)

    Mail (required)

    Website

    Message


Comments links could be nofollow free.
  • Recent Posts

    • Congratulations to Denise
    • International Council of Shopping Centers Seminar Summary
    • Green Roofing
    • Car Dealerships – One Building, Many Clients
    • Two BJG Designed Pump Stations Up and Running
  • Archives

  • Flickr Photos

  • BJG tweets

    • reviewing contracts for sub consultant agreements is time consuming. ...
    • @chrischeatham we have two in our office that are studying ...
    • prepping for company strategic planning tomorrow through saturday ...
    • Headed into sf for a seaoc high school outreach training session ...
    • listening in on autodesk sustainable webcast design series: going paperless and environmental impact of architectural practices ...
  • delicious links

    • http://www.nrel.gov/docs/fy02osti/29109.pdf
    • http://www.greer-stafford.com/pdf/notes-6.pdf
    • DOE: High Performance Buildings - Charrette Guide for High Performance Projects
    • http://www.sevengroup.com/pdf/LEED%20Charrette%20Overview.pdf
    • http://www.energyagency.at/publ/pdf/keepcool_calc_tool.pdf
© 2008 BJG - Responsive By Design
The Papercut theme by WooThemes - Premium Wordpress Themes